Hotel Casino Project Bets on Aconex

Project name: Bloomberry Resorts and Hotels Entertainment City Manila | Industry: Hospitality & CommunityProject size: US$15 billion | Location: Manila, the Philippines

Entertainment City features an integrated, five-star hotel and casino within Manila’s Pagcor City, which includes first-class leisure facilities and restaurants.

Challenges

  • Hundreds of thousands of drawings, documents and correspondence items.
  • Globally dispersed project team.
  • FTP sites and email insufficient for a project of this scale.
  • Requirement for status tracking to manage risk.

Solutions

  • Project collaboration between different participants and stakeholders on a single, central system.
  • Anytime, anywhere exchange of documents and correspondence between team members.
  • Access, distribution, tracking, and archiving of information in real time.
  • Timely review and approval of documents.

Results

  • Drawing review cycles accelerated.
  • Large files distributed in real time.
  • Fast access to information for time savings.
  • Ability to track every transaction to reduce the risk of disputes and delays.
Back to projects

Related projects

Hospitality & Community

US$200 million
Centennial renovation of the landmark Ritz-Carlton Montréal

Ritz-Carlton Montreal renovation project

Aconex is an innovative solution that centralizes our project data and streamlines our inspection processes.

Eric Lessard
Director of Information Technology

Residential & Commercial

Restaurant upgrade in Eastern Canada

Restaurant upgrade program

I knew that the system was easy to use and the client service was excellent.

Alain Bertrand
Senior Project Manager

Oil & Gas

Vista Projects operates in the oil sands and conventional oil and gas sectors

Vista Projects

The total cost of ownership savings for a product like Aconex is really significant.

Patrick Reilly
Technology Manager