Aconex turns up the heat on geothermal power station project

Project name: Nga Awa Purua Geothermal Power Station | Industry: PowerProject size: US$235 Million | Location: Rotokawa, New Zealand

The Nga Awa Purua geothermal power station, New Zealand’s second largest, produces 132 megawatts of electricity and serves more than 115,000 people. 

Challenges

  • Geographically dispersed project team in Japan and New Zealand with hundreds of participants.
  • Large volume of drawings, contracts, documentation, and emails to control.
  • Need for real-time access and information sharing.
  • Risk of information being lost or deleted.

Solutions

  • Neutral, cloud-based platform improves efficiency and accuracy.
  • All parties can view, track and share documents and correspondence in real time.
  • Audit trail documents who did what and when.
  • Automated workflows streamline review and approval processes.

Results

  • Improves day-to-day efficiency of managing information.
  • Streamlines communication processes.
  • Easily tracks status of reviews and approvals.
  • Provides transparency, accountability and risk mitigation.
Back to projects

Related projects

Oil & Gas

Vista Projects operates in the oil sands and conventional oil and gas sectors

Vista Projects

The total cost of ownership savings for a product like Aconex is really significant.

Patrick Reilly
Technology Manager

Road & Rail

US$5 billion
Denver RTD – largest voter-approved transit system expansion in the U.S.

RTD FasTracks and Capital Programs

Cooperation requires collaboration, and Aconex provides us with that.

Lisa Vallejo-Dorrance
RTD FasTracks/Capital Programs Document Control Manager

Health & Education

US$245 million
University of Alaska Fairbanks

University of Alaska Fairbanks

Aconex is like a virtual manager of people

Michael Ruckhaus, Senior Project Manager