Aconex keeps a hospital project healthy with BIM collaboration

Project name: SHBC Al Farwaniya Hospital Expansion | Industry: Health & EducationProject size: US$928 million | Location: Kuwait City, Kuwait

The Al Farwaniya Hospital expansion project will include a new state-of-the-art hospital, an outpatient clinic for dermatology and physical therapy, a dental treatment and teaching facility, a services building, and a multi-story car park. To alleviate the heating effect of a desert climate on large expanses of exposed glass, the project will make use of innovative solar-mitigation screens. A distinctive, curvilinear building design will make the most of open views, enhancing the experience of patients, staff and hospital visitors.

Challenges

  • Alternative delivery model – design, build, quip, furnish, operate, and maintain.
  • Project team of more than 20 different organizations and over 500 individuals.
  • Requirement for project-wide collaboration around BIM.
  • Delays in approval and inspection processes prolonging handover.

Solutions

  • Easy search and retrieval of project information whenever and wherever needed.
  • Automatic distribution of updates to transmittals and design documents, with version control to ensure accuracy.
  • Drag-and-drop workflows to keep review processes on track.
  • Project-wide visibility to monitor performance across organizations and help minimize delays.

Results

  • Improved productivity across the design and construction teams with Aconex Connected BIM.
  • Streamlined design reviews, with early clash detection and resolution.
  • Linkage of objects in multidimensional models with relevant documents, communications and workflows for handover.
  • Accelerated inspection processes with Aconex Field.
Back to projects

Related projects

Road & Rail

US$5 billion
Denver RTD – largest voter-approved transit system expansion in the U.S.

RTD FasTracks and Capital Programs

Cooperation requires collaboration, and Aconex provides us with that.

Lisa Vallejo-Dorrance
RTD FasTracks/Capital Programs Document Control Manager

Hospitality & Community

US$214 million
CMLC and MHPM Build Library on Top of Tunnel with Aconex

CMLC MHPM Calgary Central Library

With Aconex, it’s easy to see who got what and when.
Yamin Shihab,Senior Project Manager, MHPM