Skanska Builds with BIM

Project name: Skanska Property Poland Malta House | Industry: Residential & CommercialProject size: US$32.2 million | Location: Malta Lake, Poznán, Poland

Malta House is a Class A green office complex which was developed in compliance with the principles of sustainable development. It was the first LEED (Leadership in Energy and Environmental Design) pre-certified office building in Poznań with a Platinum rating. The total leasable space of Malta House consists of 15,700 square meters and includes 275 parking spaces for tenants. This was the first large-scale building information modeling (BIM) project for Skanska Property Poland.

Challenges

  • Requirement for the project team to share complete multidimensional models rather than only 2D drawings.
  • Critical importance of speed and reliability to support project collaboration processes for BIM.
  • Missed or late delivery of new and revised models to project participants.
  • Inefficient review and approval cycles for models.
 

Solutions

  • Secure and reliable exchange of BIM data through centralized access on single platform by all project participants.
  • Rapid user acceptance resulting from the simplicity of the user interface and fast search functionality.
  • Effective distribution of models without file size constraints, spam filters, mailbox capacity, and other email limitations. 
  • Email notification of changes to relevant project participants when not logged in to the platform.

Results

  • Grouping of communications by activity for each step of the model approval process for easy traceability.
  • Automatic maintenance of a list of delivered models, which is always complete and up to date.
  • Multi-layered access security to ensure high availability of all BIM data and compliance with required model submittal dates. 
  • Fewer errors in planning and execution due to model version control and tracking of who published revisions and when.

 

*Conject, which delivered this project, was acquired by Aconex in April 2016.

Back to projects

Related projects

Oil & Gas

Vista Projects operates in the oil sands and conventional oil and gas sectors

Vista Projects

The total cost of ownership savings for a product like Aconex is really significant.

Patrick Reilly
Technology Manager

Residential & Commercial

US$6 billion
Symphony Park, a PPP urban redevelopment project in Las Vegas

Symphony Park

For project managers, data control is everything.

Sam Gladstein
Vice President, Operations

Road & Rail

US$359 million
OHL-FCC Toronto Subway Extension

OHL-FCC Toronto Subway Extension

Aconex gives us complete control of the project
Enrique Arribas, Quality and Environment Senior Manager